From the first design option to the plaque on the façade: we calculate, verify and document the energy performance of your building so that authorities, funding bodies and the site team all work from the same figures.
Certification
Energy certificates & CasaClima
In South Tyrol the energy performance certificate is a precondition for the building permit, handover, sale and letting. We issue it for new builds and renovations and guide the CasaClima procedure from registration to the plaque.
It starts with a complete model of the building: envelope areas, construction build-ups, glazing, heat generators, distribution, ventilation and use profiles. On that basis we calculate the energy demand using the current CasaClima methodology and tell you early whether the class you are aiming for — CasaClima A, B or Gold — is genuinely within reach for the design as drawn.
If it turns out to be marginal, we show which levers give the best return for the effort: insulation thickness, glazing quality and installation detail, heat recovery, the choice and control strategy of the heat generator. For CasaClima Nature the ecological criteria come on top — material choice, water consumption, component assessment — and these have to be considered early, because they are almost impossible to retrofit later.
During the procedure we handle registration with the CasaClima Agency, submission of the project documents, coordination with the assessor and preparation for the on-site inspection. At the end you receive not only the certificate but also a summary you can hand to a bank, a buyer or a board without having to explain it first.
What you receive
- Energy performance certificate (APE) for new builds, renovations, sale and letting
- Complete CasaClima application package with calculation file and drawing set
- Early feasibility check of the achievable class, including a comparison of options
- Support through the site inspection and follow-up evidence of what was built
- A plain-language summary for owners, banks and administrations
Basis & standards
- CasaClima directive of the Autonomous Province of Bolzano
- D.Lgs. 192/2005 and the interministerial decree of 26.06.2015
- UNI/TS 11300, parts 1 to 6
Calculation
Energy-efficiency calculations
U-values, thermal bridges, heating and cooling loads: the numbers that determine build-ups and plant sizing — properly calculated instead of roughly estimated.
We calculate thermal bridges numerically to UNI EN ISO 10211, in two or three dimensions, rather than covering them with a flat-rate surcharge. You receive the linear thermal transmittance psi for every relevant junction and the temperature factor fRsi, which shows whether a junction will stay free of mould. For the critical details — balcony slab, window reveal, plinth, parapet — we compare execution options while they can still be changed.
Heating loads are calculated room by room to UNI EN 12831, using the climate data of the actual site. That matters, because South Tyrol runs from the Adige valley floor up past 1,500 metres, and a heat pump specified two kilowatts too large will cycle at part load, become audible and lose efficiency. Cooling load and overheating checks complete the picture for buildings with large glazed areas or high internal gains.
All results come together in one traceable calculation set: build-ups with material properties, U-values per component, a thermal bridge catalogue and the load calculation. Designers can work from it, assessors can follow it — and when the design changes later, we do not start from scratch.
What you receive
- U-value documentation for every component, with build-ups and material properties
- Numerical thermal bridge calculation with psi values and temperature factors
- Room-by-room heating load calculation as the basis for emitters and heat generators
- Cooling load assessment for air conditioning, ventilation and shading strategy
- Comparison of options for insulation thickness, glazing and junction details
Basis & standards
- UNI EN ISO 10211 – numerical calculation of thermal bridges
- UNI EN ISO 6946 – thermal transmittance of building components
- UNI EN 12831 – design heat load
- UNI EN ISO 52016-1 – heating and cooling demand
Building physics
Building physics
Moisture, summer overheating and sound decide whether a construction works not just on paper, but for decades.
For every critical component we carry out the moisture assessment to UNI EN ISO 13788 (Glaser method) and evaluate whether condensation forms in winter and dries out again in summer. We look particularly closely at internal insulation in existing buildings, unventilated roofs, timber elements with a vapour control layer, and junctions with historic masonry — that is where the damage appears that only becomes visible years later.
Summer heat protection has long stopped being a side issue in South Tyrol. We assess the phase shift and amplitude damping of the components to UNI EN ISO 13786 and develop a strategy from thermal mass, external shading, window orientation and night ventilation. The aim is rooms that stay comfortable without cooling — or with the smallest possible cooling system.
Where the project calls for it, acoustics are part of the work: preliminary sizing of separating walls and floor slabs, impact sound, façade sound insulation on through roads, and building services noise. In hotels and apartment buildings in particular, complaints can only be avoided if these questions are settled before construction starts.
What you receive
- Glaser assessment per component, evaluating condensation and drying potential
- Review of internal insulation and critical junction details in existing buildings
- Summer heat protection assessment with phase shift and amplitude damping
- Strategy for thermal mass, shading and night ventilation
- Preliminary acoustic sizing of walls, floors and façade
Basis & standards
- UNI EN ISO 13788 – condensation assessment, Glaser method
- UNI EN ISO 13786 – dynamic thermal properties of components
- DPCM 5.12.1997 – passive acoustic requirements for buildings
Existing buildings
Energy audits & renovation concepts
Survey, consumption analysis and comparison of options. You learn which renovation steps deliver the most per euro invested, and in what order to take them.
We start on site: recording build-ups, documenting plant and controls, understanding the layers of construction periods and earlier interventions. Consumption data from recent years is added, corrected for weather and occupancy. Only then do we have a reliable baseline in kilowatt-hours per square metre and year, against which every proposed measure can be measured.
We then model two to four scenarios — from a single measure to a full retrofit — each with energy demand, investment range, incentive effect and carbon balance. It often turns out that the obvious sequence is the wrong one: a new heat pump installed before the envelope is insulated ends up oversized and runs permanently at the wrong operating point.
The result is a staged renovation roadmap that fits your budget and your replacement cycles without blocking later steps. For companies we prepare energy audits to UNI CEI EN 16247, including a list of measures with an economic assessment.
What you receive
- On-site survey with a component catalogue and an overview of building services
- Consumption analysis and benchmarking in kWh/m²a
- Two to four renovation options with energy, cost and carbon balances
- Staged renovation roadmap with a reasoned sequence of measures
- Economic assessment including payback and the effect of incentives
Basis & standards
- UNI CEI EN 16247 – energy audits
- D.Lgs. 102/2014 – energy efficiency and audit obligations
- UNI/TS 11300 – assessment of existing buildings
Incentives
Incentive advice
Italian tax deductions, subsidies of the Autonomous Province of Bolzano and ENEA filings: we prepare the technical evidence and take you through the procedures on time.
Incentives are not won at the invoicing stage but during design. Before construction begins we check which instruments apply to your project — the tax deductions for energy retrofits in force at the time, the subsidies of the Autonomous Province of Bolzano, programmes for renewable installations — and which technical minimum requirements go with them. Often it is a few centimetres of insulation or a better window frame that decides eligibility.
We then build the chain of evidence: energy assessment before and after the intervention, technical descriptions, U-value documentation for the components claimed, and the technician's declarations. We file the ENEA notification within the prescribed period after completion — a deadline on which a surprising number of otherwise correct retrofits fail.
We will also tell you when an incentive is not worth pursuing. Some conditions cost more than the grant returns, and some instruments cannot be combined. You get that assessment from us in writing, before you commit.
What you receive
- Eligibility check before construction starts, summarised in writing
- Technical evidence for tax deductions and provincial subsidies
- Energy assessment before and after the works as the basis for funding
- ENEA notification filed within the prescribed deadlines
- Schedule for applications, proof of payment and record keeping
Basis & standards
- Funding directives of the Autonomous Province of Bolzano
- Italian tax deductions as currently in force
- ENEA notification procedure for energy retrofits
Building services
Renewable energy
Sizing of photovoltaics, storage and heat pumps — dimensioned for how the building is actually used and for a site in the mountains.
For photovoltaics we work with pitch, orientation and shading — and in the Alps that includes the horizon: a slope to the south or a church tower costs more winter yield than any debate about module brands. We set the yield forecast against your building's load profile. Only that comparison shows how much self-consumption is realistic, and whether a battery makes economic sense or simply ties up capital.
Heat pumps are sized against the calculated heat load, not against rules of thumb: choice of source (air, ground, groundwater), bivalence point, flow temperature in combination with the emitters, and an estimate of the seasonal performance factor. We flag questions of siting and noise early, since they can become a real problem in a dense village centre.
Where photovoltaics, storage, heat pump and hot water interact, we look at the building as a system and improve self-consumption through operating strategy and controls. On request we also assess participation in a renewable energy community.
What you receive
- Photovoltaic yield forecast including horizon and object shading
- Load profile comparison and a realistic assessment of self-consumption
- Sizing of storage and heat pump, including the bivalence point
- Estimate of the seasonal performance factor and future running costs
- Comparison of heat generator options with a running cost forecast
Basis & standards
- UNI EN 15316 – calculation of building services systems
- UNI EN 14825 – heat pumps, part load and SCOP
- D.Lgs. 199/2021 – minimum share of renewable energy
Regulatory basis
The framework we calculate within
Energy performance is densely regulated in Italy and in South Tyrol — national decrees, provincial rules and technical standards all interlock. We work with that framework every day so that you do not have to.
- CasaClima directive
- Technical requirements of the Autonomous Province of Bolzano for classification, application and inspection.
- D.Lgs. 192/2005 & DM 26.06.2015
- National minimum requirements for the building envelope, building services and documentation.
- UNI/TS 11300
- Italian calculation standards for heating, cooling and hot water demand, including system losses.
- UNI EN ISO 10211 & 6946
- Numerical calculation of thermal bridges and thermal transmittance of building components.
- UNI EN ISO 13788
- Moisture protection and the assessment of condensation in multi-layer constructions.
- D.Lgs. 199/2021
- Minimum share of renewable energy for new buildings and major renovations.
Who we work for
Four perspectives on the same building
Owners, design teams, contractors and operators need different answers from the same calculations. We give each of them something they can act on.
Owners & private clients
A clear basis for decisions instead of jargon: what each option costs, what it saves in operation, and which incentive is realistic.
Architects & design teams
Documentation that supports the design rather than fighting it — with feedback on details while they can still be changed.
Contractors & trades
Buildable specifications for build-ups, junctions and plant parameters, plus support during inspections on site.
Businesses & public bodies
Energy audits, renovation roadmaps and documentation for hotels, commercial property and public buildings, aligned with budget cycles.
Contact
Which service your project needs is something we settle in the first conversation
Send us drawings, consumption data or simply the address of the building. Within two working days you will receive an assessment of scope, deadlines and available incentives — free of charge and without obligation.